To minimize site fabrication the wet gas inlet and dry gas outlet manifolds were fully modularized in a yard in Corpus Christi. The module weighed over 800,000 lbs. The design incorporated 3-phase separation on the liquid end to help separate hydrocarbons from water and also allow for a corrosion resistant alloy (CRA) to be implemented in the most corrosive sections of the slug catcher.

Location: Australia

Design: (2) 8 – finger Slug Catchers

Gas Flow: 1470 MMSCFD

Storage: 24,203bbls

Design Pressure: 2060 psig

Specials: Modularized in a Corpus Christi fabrication yard, 3-phase separation

Line Pipe: 42” API 5L

Other Project Highlights

Inconel 625 cladded Slug Catcher for the world’s largest operating LNG facility.

Critical path project coordinated with companies all around the globe.

Sour service Slug Catcher.

WHY US

Taylor Forge Engineered Systems
has continued the reputation of traditionally dependable products
to a variety of industries.

Integrity

We don’t compromise our practices and we won’t cut corners.

Collaboration

We take a consultative approach with customers and appreciate the big picture.

Innovation

Setting the standard requires fully understanding the box and when to think outside of it.
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search