In a collaboration between an American manufacturer, international oil major, and Eastern European freight provider, a slug catcher was air freighted to a petroleum development in Iraq. This schedule critical project was engineered, fabricated and delivered in under 24 weeks.

Location: Majnoon Oil Field, Iraq

Design: (1) 6 – finger Slug Catcher

Gas Flow: 99 MMSCFD

Storage: 7,300bbls

Design Pressure: 1363 psig

Specials: Air Freight out of Kansas City International Airport

Line Pipe: 48” API 5L Line Pipe

Other Project Highlights

Fast-tracked Permian Basin project.

One of the largest modular cladded Slug Catchers ever built.

Inconel 625 cladded Slug Catcher for the world’s largest operating LNG facility.

WHY US

Taylor Forge Engineered Systems
has continued the reputation of traditionally dependable products
to a variety of industries.

Integrity

We don’t compromise our practices and we won’t cut corners.

Collaboration

We take a consultative approach with customers and appreciate the big picture.

Innovation

Setting the standard requires fully understanding the box and when to think outside of it.
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search