Two of fourteen (14) 3-phase slug catchers Taylor Forge has supplied to Qatar. The slug catchers support the largest LNG facility in the world. Due to the extreme conditions of the process fluids, the carbon steel plate was HIC and SSC tested, and portions of line pipe and liquid manifolding was cladded with Inconel, all in effort to limit corrosion. In addition, to help set an interface for the hydrocarbons and water within the system, the proprietary TFES S-bend was implemented for 3-phase separation.
Location: Qatar
Design: (2) 12 – finger Slug Catchers
Gas Flow: 3.016 BCFD
Storage: 31,449bbls
Design Pressure: 2161 psig
Specials: Inconel cladded liquid manifolds and 3-phase separation
Line Pipe: 48” API 5L Line Pipe w/ Inconel Cladding
Other Project Highlights
WHY US
Taylor Forge Engineered Systems
has continued the reputation of traditionally dependable products
to a variety of industries.
Integrity
We don’t compromise our practices and we won’t cut corners.
Collaboration
We take a consultative approach with customers and appreciate the big picture.
Innovation
Setting the standard requires fully understanding the box and when to think outside of it.