This was a critical path project delivery (12) manifolds to (6) different compressors stations. The CSA specifications utilize the full breadth of Taylor Forge’s capabilities from in house impacts tests to fully surveyed ovens for heat treating.

Location: Canada

Design: Aftercooler Manifolds

Scope of Work: (12) 42″ manifolds with (20) 12″ extruded outlets.

Design Pressure: 1440 psig

Code: CSA Z662.15 – Pipeline Code and CSA Z245.11 – Fitting Specifications

Other Project Highlights

Inconel 625 cladded Slug Catcher for the world’s largest operating LNG facility.

One of the largest modular cladded Slug Catchers ever built.

Critical path project coordinated with companies all around the globe.

WHY US

Taylor Forge Engineered Systems
has continued the reputation of traditionally dependable products
to a variety of industries.

Integrity

We don’t compromise our practices and we won’t cut corners.

Collaboration

We take a consultative approach with customers and appreciate the big picture.

Innovation

Setting the standard requires fully understanding the box and when to think outside of it.
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search